Project: The Train Garage Depot-Shapir
City: Jerusalem
Contractor:Tidhar Group
The purpose of the project: Construction of a garage for a train
The project sits on an area of approximately 35,000 square meters per floor.
In this project, a garage for a train is being built.
3 floors below the ground floor, when the height of the floors is not standard, between 5-9 m.
to the second floor:
For ceilings and beams – a system of aluminum towers was chosen.
For the walls – a system of aluminum Rasta + type modular molds. The walls are 9.5 m high, combined with reinforcements from aluminum uprights and intricate legs.
GFL ceiling – thickness 2 m height, support 8.5 m.
The ceiling was designed with the help of a system of aluminum towers and a horizontal system full of aluminum, thanks to which it is possible to reach large openings and high outputs of the skeleton contractor.
for third and fourth floor
For ceilings: System Rasta Deck -400 falling head for casting ceilings, with the possibility of early disassembly. The system enabled speed, quality and safety at a high level.
For the walls: a system of modular aluminum molds of the Rasta+ type for convenient and simple work, with an option for manual work and without a crane.
In addition, the use of supporting beams was made – a system of aluminum towers that is easy and convenient to work with.