Project: Yefe Nof
City:Haifa
Contractor: ELYAKIM BENARI PROJECTS
The purpose of the project: origin bridge on the new route 16 in jerusalem
The ceilings of the basement floors (-2,-3) were cast using the POST&BEAM system – aluminum (ligers 14 cm).
The 1st basement floor and the ground floor were cast using the ACRO tower system, 2 Tsol’.
In addition, for casting the dimensions in the building, we used a shrinking cell from modular molds
The duration of the project is about 3 years. We continue to accompany the project in the field from the planning stage until the end of the skeleton period.