Project: The college
City: Savion Junction
Contractor: Tidhar Group
In this project we were asked to provide a solution for the construction of a college building. 5 basement floors – 11,000 square meters each floor. 6 floors above ground – 6,000 square meters each floor.
– Acro towers system to support beams and ceilings combined with a horizontal system of aluminum sources that allow for large developers and maximum utilization of the system.
– The ALUMAX formwork system that was supplied assembled to the area for the execution of all the peripheral walls, the reason for using this system is due to the requirement to obtain a high level concrete finish.
Scaffolding peripheral consoles – for making castings for external walls.
The ceiling system – Rasta Deck -400 for casting mica ceilings in an area of 2,000 square meters.