PROJECTS

Shmaryahu Interchange

Project: Shmaryahu Interchange

City: Kfar Shmaryahu

Contractor: Ashtrom – Shafir

The project lasted four years.

A 5,000 square meters reservoir of water was made.

Pedestrian and road bridges were made when the thickness of the ceiling changes (D1.5, D1.5).

The aluform pillars were designed for the execution of exposed concrete pillars at a height of 7 meters and plankton heights of up to 12 meters.

Gallery

Skip to content