Raul Wallenberg, Tel Aviv

Project: Raul Wallenberg
City: Tel Aviv
 Contractor: Tidhar Company
The purpose of the project: YBOX Office tower in ramat hay’il, Tel-aviv

Main construction:

An integrated project with two buildings, the first building will be used for offices and has 5 floors, the second building will be used for residences and has 22 floors. In addition, 3 common basements will be built for both buildings

The following Alumlight systems were used in the project:

Climbing system KLK To the nucleus climbs

MGSH hydraulic climbing protection system

Concrete pouring tables

YBOX office tower in Ramat Hay’il, Tel Aviv, which is being built by Tidhar Group. In view of limited organizing areas, a solution of a climbing core using a crane and a MGS-H type hydraulic protection system was decided

Alumlitght new defense system, which stars in the skies of Tel Aviv >> MGS-H system.
A perimeter protection system designed to protect the workers and give them a sense of security while working on the two activity floors.
The system is combined with leading rails and perforated nets for the possibility of ventilation and the entry of sunlight into the activity floors.
The system allows hydraulic work without adding parts or changing the structure. With the help of the system, you can combine loading platforms to remove equipment from the lower floor to the upper floor.