Mizrahi Tefahot Bank - Lod

Project: Mizrahi Tefahot Bank
City: Lod
 Contractor: B.S.T Group Construction Ltd
The purpose of the project: Expanding an existing office building and adding eight floors of office space

Main construction:

In the Mizrahi Bank project, we were asked to carry out planning for the expansion of an existing office building, adding office space of eight floors, including parking floors.

The following Alumlight systems were used in the project:

Elevator platform system

Concrete pouring tables

There is an underground floor – one basement floor, therefore the casting of the floors is done above ground, including the parking lot floors. Above the basement floor we poured floor number one, the entrance floor of the building. After that, we started pouring three parking floors above ground, and finally pouring the office floors of Bank Mizrahi, which extend from the fourth floor onward.

For the casting of the walls of the floors we used the Rasta+ mold system, modular aluminum molds that are easy to carry, which provide smooth and high-quality concrete results.

In the planning of the construction of the bank, it was decided on castings for suspended ceilings, ceilings that protrude from the building without a floor beneath them to a support height of about 28 m from the floor, with the help of a system of aluminum towers that were designed for a demand for particularly high support.

For the casting of the ceilings in the project, we used the Rasta Deck -400 system, a smart ceiling system with a falling head method that allows you to work quickly and professionally.

From the casting of the fourth floor onwards, we added the planning of the perimeter of the building with the help of concrete casting tables, which can be moved around the floor using carts, and lifted from floor to floor using a crane.

The project is unique and a quick solution is required, therefore unique casting systems were designed for casting the building in the best way.