Rothschild Tel Aviv

Project: 
City: tel aviv
 Contractor:Tidhar Group
The purpose of the project: 

The following Alumlight systems were used in the project:

Bondage system: To ensure the stability of the towers, which rises to a height of about 22 m

Horizontal system: Light and strong aluminum

Casting a transformation ceiling, 3 m thick concrete on top of 20 m high towers, when the casting is carried out above conservation buildings surrounding the tower. The task is extraordinary in its complexity and included precise planning and close supervision of the contractor and the site team. The systems designed for the project are: tower systems, a tying system and a light and strong aluminum horizontal system