Yefe Nof - Haifa

Project: Yefe Nof  
City:Haifa
 Contractor: ELYAKIM BENARI PROJECTS 
The purpose of the project: origin bridge on the new route 16 in jerusalem
  

The following Alumlight systems were used in the project:

  • The casting of the core walls was done with the help of modular Rasta + molds.
  •  For casting one-sided walls for a low exit in the basement floors, a one-sided system is used – rals, for casting up to a height of three meters.
  •  For the ground floor, a system of triangles was provided for the foundation wall suitable for castings over 3 m high. The height of the casting on this floor was 4.5 m.
  • A shaft platform supported by negatives was used for climbing until the end of the project. This platform is used to close the pick and the work surface.
  • The ceilings of the basement floors (-2,-3) were cast using the POST&BEAM system – aluminum (ligers 14 cm).

  • The 1st basement floor and the ground floor were cast using the ACRO tower system, 2 Tsol’.

  • In addition, for casting the dimensions in the building, we used a shrinking cell from modular molds

    The duration of the project is about 3 years. We continue to accompany the project in the field from the planning stage until the end of the skeleton period.